What survey data costs, and what changes it
A survey is priced on the site rather than by the hectare, because two sites of the same size can be completely different jobs depending on what is on the ground and how accurate the answer has to be. What moves the price is the size and shape of the site, the cover on it, the tolerance you need, the outputs you want back, and how hard the site is to get on to and work in.
Why nobody can price a survey from the area alone
The first thing most people ask is what a survey costs per hectare or per site. Area on its own tells us almost nothing, because it says nothing about the work.
An open field and a wooded slope of the same size are two different surveys. So are a square site and a corridor, and so are a site you can drive onto and one that needs an escort and an induction. What is priced is the work, and the work is set by the ground, the access and the answer you need.
What moves the price
These are what we look at when we scope a job, and why two sites that look similar on a map are quoted differently.
Most of them are things you already know about your site, which is why a short, specific description gets you a price faster than a long one.
What a quote should tell you
We scope the work and send a quote that names the deliverables, the formats and the delivery date. A quote that does not name those three things cannot be compared with one that does, whoever it comes from.
It should also be clear about what happens if the site turns out to be different from the description. If a site condition changes the plan while we are there, you hear about it that day, and if anything moves the delivery date we tell you.
Scoping it wrong in either direction
The costly mistake is a survey that has to be done again. A tolerance that turns out to be too loose for the design, an output nobody asked for until the drawings started, or a coordinate system that does not match the project all mean going back to the site or back into processing.
Over-specifying wastes money too, just less visibly. A tolerance tighter than the design needs, deliverables nobody opens and formats nobody uses are paid for and never used. The scoping conversation is where both are avoided, which is why we ask what the data is for and not only what you want back.
What you can do to bring it down
Send the site extent as a boundary file or a marked plan rather than a description. Send any existing control. Say who holds the keys, who to book in with and what the site rules are. Each of those removes something we would otherwise have to allow for in the price.
Then group the work. Several sites in one area can be planned together. One visit that captures everything costs less than two. A repeat programme agreed at the start costs less than the same jobs bought one at a time.
How to get a number for your site
Tell us where the site is, what you need to know about it, the outputs you need, the coordinate system your project uses and when you need it by. That is enough to scope the job and price it.
You get a quote within one working day, from a surveyor who has looked at the job. The promise is the same whichever way you get in touch: reply within one working day.
| What changes the price | Why it changes it | What helps |
|---|---|---|
| The size and shape of the site | A long thin corridor takes more capture and more control than a square of the same area | Send the boundary as a file or a marked plan |
| What is growing on it | Ground under cover has to be reached with LiDAR and built from fewer points, which is a different survey from an open field | Say what the cover is, and whether the ground under it is what you need |
| The accuracy you need | A tighter tolerance means more control, closer capture and more checking | Tell us what the data is for, and we will tell you what tolerance it actually needs |
| How many outputs, and in what formats | Every extra deliverable is more processing, drawing and checking | Ask for what your team will open and use, and agree the list before the job is booked |
| Access, permissions and site rules | Escorts, inductions, live traffic, railway access and airspace all take time before anything is captured | Tell us who controls access and what the rules are at the enquiry, not on the day |
| One survey or a programme | Repeat capture reuses the control and the plan, so later visits are not the same job as the first | If you know it will be repeated, say so at the start |
| Where the site is, and whether there are others near it | Travel and mobilisation are part of the job, and several sites in one area can be planned together | Send all the sites at once rather than one at a time |
| When you need it | A date that has to be met changes how the job is planned and crewed | Give us the real date, and the earliest useful one if they are different |
Questions we get asked
Can you give me a price over the phone?
Why does accuracy change the price?
Is flying a site cheaper than surveying it on the ground?
What makes a survey cost more than the client expected?
Does a repeat survey cost the same as the first one?
This guide feeds: Aerial Survey & Mapping · LiDAR Survey · Laser Scanning · Monitoring & Progress
Talk to us about your site.
Tell us where it is and what you need to know about it, and you get a quote within one working day.