Enhanced CAA permissionsISO 9001 & 27001Police vettedUK wide
FlyThruContact us
Home/Accuracy

Accuracy

How the accuracy of a survey is set for the job, and how you can check it.

On this page: Every job states its accuracy, and proves it · Ground control on every job · The coordinate system your project uses · What we check, and when · What changes the figure

A yellow and black chequered control target in the foreground with a wind turbine behind it
Control, before anything is flown

Every job states its accuracy, and proves it

Accuracy is stated for every job and verified against ground control before anything is issued. Every deliverable carries its own figure, and the survey report shows the check that produced it.

Ground control on every job

We place ground control targets on every job and measure them before the survey starts. The processed data is then compared against those measured points, and that comparison is issued with the survey.

Where a site has existing control, we use it and check it. Where the ground cannot be reached safely, as on an unstable slope, control goes on the stable ground around the site and the flight is planned so the data ties back to it.

The coordinate system your project uses

You tell us the horizontal and vertical system your project runs on, and we deliver in it. It is agreed at the scoping step, before capture, so nothing has to be transformed after the fact.

The system is stated on every sheet and in the survey report, so anyone opening the data later knows what it is tied to without asking.

What we check, and when

We check twice. On site, we check the data before we leave, so a gap or a failed target is found while we are still standing on the site rather than a week later.

In processing, we compare the finished model against the measured control and record the result. That comparison goes in the survey report, with the control coordinates behind it.

If your own surveyor wants to check our work, ask and we will send the control and the comparison in full.

What changes the figure

Vegetation is the biggest one. Under dense canopy, fewer pulses reach the ground, so the terrain model is built from fewer points and the figure reflects that. A bare field and a wooded hillside are not the same job.

Flying height, the density of the control, the size of the site and the weather on the day all move it as well. That is why we state a figure for your site when we quote it, rather than quoting a best case from a different job.

If the figure you need is tighter than what the site allows from the air, we will say so and tell you what would get you there, including whether ground based capture is the better answer.

How accurate is it?

It depends on the survey type, the site and the control, so we do not publish one number that covers everything we do. What we do is state the figure for your job in writing when we quote it, place and measure ground control on site, and check the processed data against that control before anything is issued. The survey report shows the check, so your own surveyor can repeat it.

Tell us about the site.

You get a fixed quote within one working day, from the surveyor who would do the work.

Talk to a surveyorDirect line
07940 738037Reply within one working day